FAU Schmidt Complex for Academic & Athletic Excellence Groundbreaking Renderings
Posted
VIP DONOR
Member since 2007
Posted
VIP DONOR
Member since 2008
Owl2Doc said
They put these banners up but I think they're still tinkering with the final design…Posted On: Jan 13th 2018, 2:36 PM #376333
Yea, saw those when we were there for the Marshall game. Wish I could have won the lottery like the kid up above Tampa did. Entire complex be a done deal!!!
Posted
VIP DONOR
Member since 2007
This thing is still listed as "design started" (not "design complete") as of January 10th on the Major Projects sheet. That doesn't inspire great confidence that they're going to bring in cranes next month.
Posted
VIP DONOR
Member since 2006
When I last spoke to people at FAU "in the know" - they laughed at the notion we would break ground on this before fall 2018. They even said that is a stretch and would bet on 2019.Owl2Doc said
Ok. I know they've been up for a little bit but not sure how many people have seen them (especially the people from out of state)
This thing is still listed as "design started" (not "design complete") as of January 10th on the Major Projects sheet. That doesn't inspire great confidence that they're going to bring in cranes next month.
Posted On: Jan 14th 2018, 9:57 PM #376352
Remember the pain and waiitng on building the stadium? That was a 6-7 year process....painful process.
Teambeer is the most knowledgeable FAU sports fan I know, way smarter than me.
Posted
VIP DONOR
Member since 2007
Then again I can see this project being different because of the phasing plan, what to include now vs later, which can also change if more money comes in.
Posted
VIP DONOR
Member since 2008
Owl2Doc said
I don't disagree but then again this is essentially an academic building and it usually doesn't take this long to settle on the architecture.
Then again I can see this project being different because of the phasing plan, what to include now vs later, which can also change if more money comes in.Posted On: Jan 15th 2018, 11:22 AM #376359
I agree, I think design should have been settled a long time ago, this is not a "new" project anymore! THAT HAS to be done before accurate construction estimates and contracts followed by permits and THEN by actual construction!!!! GOTTA BE PASSED THAT LEVEL AT LEAST, RIGHT????
Posted
Wise Owl
Member since 2011
Posted
First Flight
Member since 2016
Posted
VIP DONOR
Member since 2012
Posted
VIP DONOR
Member since 2004
StPeteOwl said
They know the cost (which means they've had this priced by builders/subs) and we assume they are at 95% on design, if not 100%. Minor changes in architecturals, details, etc do not drastically change the price, if anything, I would think they are looking for opportunities to drop price with value engineering options. My senses tell me this is a financing issue.Posted On: Jan 24th 2018, 6:02 PM #376652
Design changes typically do cost money unless they're reducing scope or as you stated looking for value engineering. Another issue is pricing. With the Trump effect in top gear, construction costs are rising. It's basic supply and demand. Contractors are in high demand and there's a lack of quality skilled labor. The guys at my rep firm are working 60 to 70 hours a week and we still can't keep up. We're easily getting 25 to 30 bid job requests a day.
With that being said, I hope they pull the trigger soon cause it ain't gonna get any cheaper…..
Go Owls!
Control functions:
Recent Forum Posts
Friday Final:FAU 6, UTSA 1The Florida Atlantic softball team (…
Postgame featuring Coach Mac and CJ Williams!
CJ has really become a quality starter. TBH, he's been better t…
Just what the Doctor ordered. Nice win! UPDATED SCHEDULE
Owls have complete control of this game!